Condensate Pump

June 2026 Condensate Pump We recently completed the fabrication of a small condensatepump for one of our valued clients.The unit was expertly built in our fully equipped workshop by our team of experienced and coded welders, ensuring the highest standards of workmanship and reliability.As always, the project was completed on schedule and delivered on time, […]
Keith, Scotland

May 2026 Keith, Scotland All pipework for this project was fabricated in-house at our workshop, using thin-wall stainless steel. The fabrication was carried out by our team of fully coded welders, strictly following detailed engineering drawings. By completing the fabrication off-site, we significantly reduced installation time on location. Our highly skilled pipefitters then carried out […]
Bepoke Pump Skid Fabrication and Installation

April 2026 Bepoke PumpSkid Fabrication and Installation. This month Entech successfully completed the fabrication of a bespoke pump skid package on behalf of a valued client. Our client required a dual-pump skid system with full pipework, insulation, and integrated controls. The package had to be built to exacting standards, ensuring long-term reliability and efficient site […]
Pumpsets Built In House and Ready for Dispatch

March 2026 Pumpsets Built In House and Ready for Dispatch This September Entech completed another batch of pumpsets, all built in-house and now ready to go out to one of our valued customers. Each unit was assembled at our workshop and prepared for dispatch by our production team. These completed pumpsets will be shipped to […]
Full Plantroom Installation Completed

February 2026 Full PlantroomInstallation Completed This month saw the completion of a full plantroom installation by the Entech team.The project included the installation of new air source heat pumps, allowing the site to fully decarbonise its heating system. Our engineers managed the full installation process. From mechanical fit-out through to commissioning, ensuring all equipment was […]
In House Pre Fabrication

January 2026 In House Pre Fabrication A large volume of prefabricated pipe spools were manufactured in-house within our workshop using thin wall metric stainless steel. All spools were carefully set out, cut and formed to precise measurements before being accurately aligned and welded in a controlled workshop environment. Carrying out the prefabrication off-site allowed us […]
Installation at recycling plant

December 2025 Installation at recycling plant The existing pipework lacked high-pressure test certifications and was replaced with certified high-pressure piping to ensure safety and compliance.Simultaneously, a new, larger pump was installed to meet operational demands, and the original, smaller pump was relocated upstream to the front of the line. This upgrade ensures full regulatory compliance […]
Chilled Water Infrastructure Upgrade

Novemeber 2025 Chilled Water InfrastructureUpgrade Installed an upgraded chilled water system parallel to live operations to support increased demand from relocated machinery. Pre-installed all uprated pipework and executed a seamless system transfer during a scheduled shutdown, eliminating operational downtime.