Entech delivered the mechanical installation of two high-efficiency chillers and a duty/standby pumpset, utilizing thin-wall stainless steel pipework to reduce hot works and accelerate the build.
All pipework was finished with high-specification closed-cell lagging and durable cladding for complete condensation control, handing over a fully tested, N+1 redundant cooling system built for long-term reliability.